Georgia SWPPP inspections: did rain trigger one?

Enter the site address. See 14 days of rain against the 0.5 in line.

Check my site Free for one site and one camera. $99 a site after.
Free tool, no sign-up Works on a phone Crew always free
Rain at the siteLast 14 days
Inspect by Fri, Nov 13

Sample site · 1.52 in over 14 days. Georgia NPDES stand-alone construction (GAR100001): inspect within 24 hours of 0.5 in or more, plus every 7 days.

  • Thu, Nov 12: 0.80 in → inspect by Fri, Nov 13

Rain from Open-Meteo for the site's location. A gauge on site beats any weather service; your permit has the final word.

1Use the toolEnter the site address. See the rain.
2Add your siteFree for one site and one camera. No card.
3SWPPP, plus what you needSWPPP, plus camera photos of every BMP

Georgia: the rule

Inspect every 7 calendar days and within 24 hours of the end of a storm of 0.5 in or more. Measure rain daily.

PermitGeorgia NPDES stand-alone construction (GAR100001)
Rain that triggers0.5 in in 24 hours
Inspect within24 hours
Routineevery 7 days
SourceGeorgia EPD GAR100001 (2023) inspection requirements; check the current permit
In the Dozer app · SWPPP

Next storm, the inspection is drafted before you're awake.

Dozer watches the rain at the site and the forecast. When a storm crosses the line, it photographs the BMPs from the cameras and drafts the inspection for your inspector to sign.

  • Rain measured at the site, not the airport
  • The inspection due date counted for you
  • BMP photos from the site cameras, before and after
  • A signed report in the site's records
SWPPP in Dozer: SWPPP inspection due after 0.8 in of rain LIVE SWPPP inspection due after 0.8 in of rain

Photo is an AI-generated stand-in, not a customer site.

Email me the PDF

We'll send this to you as a PDF, plus a reminder if there's a date in it. One email, no list.

We use it to send this and nothing else. See privacy.

Questions crews ask

How much rain triggers a SWPPP inspection in Georgia?

0.5 inches or more in 24 hours under the Georgia NPDES stand-alone construction (GAR100001). Inspect within 24 hours, plus routine inspections every 7 days.

Which permit covers construction stormwater in Georgia?

The Georgia NPDES stand-alone construction (GAR100001). Check your notice of intent and your site's SWPPP for anything stricter.

What if it rains several days in a row?

Each day that crosses the line needs its own inspection.

Where does the rule come from?

Georgia EPD GAR100001 (2023) inspection requirements; check the current permit

Your site at 6 a.m., before you're there.

Free for one site and one camera. $99 a site after. Crew is always free. 7 days of everything free, no card.

Check my site