Ladder safety toolbox talk: ladder setup: 4 to 1, 3 feet over

Read these 5 points to the crew before work, ask the questions, and get signatures. Based on 29 CFR 1926.1053(b).

Say this

  1. 1 ft out for every 4 ft up.
  2. 3 ft above the landing so you have something to hold.
  3. Tie it off or have someone hold it.
  4. Firm, level footing; never on boxes or buckets.
  5. Damaged ladder: tag it and take it out of use.

Ask the crew

  • Where on this site today does "ladder setup: 4 to 1, 3 feet over" matter most?
  • What would you do first if it went wrong?
  • Who do you tell, and how?

Hazards on today's tasks

How to give it

Hold it where the work is, at the start of the shift, standing up. Read each point out loud, then point at the real thing on this site: the trench, the ladder, the machine, the cord. Ask the questions and wait for answers; the quiet ones often know the most. Keep it to about 5 minutes so it gets done every day.

Write down anything the crew raises and fix it before the work starts. Everyone signs, including subs and visitors working that shift. Keep the signed sheet with the day's JHA; it's your record that the training happened (29 CFR 1926.1053(b), and 29 CFR 1926.21(b)(2)).

Sign-in

NameSignatureDate
 
 
 
 
 

Goes with the JHA for ladder use.

Questions crews ask

How long is the ladder setup: 4 to 1, 3 feet over toolbox talk?

About 5 minutes: read the 5 points, ask the questions, and have the crew sign.

Which OSHA rule is it based on?

29 CFR 1926.1053(b).