Rigging and tag lines
Read these 5 points to the crew before work, ask the questions, and get signatures. Based on 29 CFR 1926.251.
Say this
- Inspect slings, shackles and hooks before each shift. Cut, kinked or crushed means out of service.
- Know the load weight and the sling's rated load for the hitch you're using.
- Pad sharp edges.
- Tag lines on every load. Never wrap a tag line around your hand.
- Nobody under the load.
Ask the crew
- Where on this site today does "rigging and tag lines" matter most?
- What would you do first if it went wrong?
- Who do you tell, and how?
Hazards on today's tasks
- Pipe lifts: Dropped load from a bad sling or hitch
- Pipe lifts: Swinging pipe hitting a worker
- Pipe lifts: Hands and feet crushed when setting pipe in the trench
How to give it
Hold it where the work is, at the start of the shift, standing up. Read each point out loud, then point at the real thing on this site: the trench, the ladder, the machine, the cord. Ask the questions and wait for answers; the quiet ones often know the most. Keep it to about 5 minutes so it gets done every day.
Write down anything the crew raises and fix it before the work starts. Everyone signs, including subs and visitors working that shift. Keep the signed sheet with the day's JHA; it's your record that the training happened (29 CFR 1926.251, and 29 CFR 1926.21(b)(2)).
Sign-in
| Name | Signature | Date |
|---|---|---|
Goes with the JHA for pipe lifts.
Questions crews ask
How long is the rigging and tag lines toolbox talk?
About 5 minutes: read the 5 points, ask the questions, and have the crew sign.
Which OSHA rule is it based on?
29 CFR 1926.251.
Tomorrow, the crew signs on one phone.
Free for one site and one camera. $99 a site after. Crew is always free. 7 days of everything free, no card.
