Never under the load
Read these 4 points to the crew before work, ask the questions, and get signatures. Based on 29 CFR 1926.1425.
Say this
- Nobody under a suspended load. Ever.
- Plan the load path away from people.
- Use tag lines to guide it, not hands.
- Rigging fails without warning.
Ask the crew
- Where on this site today does "never under the load" matter most?
- What would you do first if it went wrong?
- Who do you tell, and how?
Hazards on today's tasks
- Crane lift: Dropped or swinging load
- Crane lift: Crane tipping: soft ground, overload, outriggers not out
- Crane lift: Power line contact
- Tilt-up and precast panels: Panel falling during the lift or before it's braced
- Tilt-up and precast panels: Crane tipping or rigging failure
- Tilt-up and precast panels: Lifting insert pulling out
How to give it
Hold it where the work is, at the start of the shift, standing up. Read each point out loud, then point at the real thing on this site: the trench, the ladder, the machine, the cord. Ask the questions and wait for answers; the quiet ones often know the most. Keep it to about 5 minutes so it gets done every day.
Write down anything the crew raises and fix it before the work starts. Everyone signs, including subs and visitors working that shift. Keep the signed sheet with the day's JHA; it's your record that the training happened (29 CFR 1926.1425, and 29 CFR 1926.21(b)(2)).
Sign-in
| Name | Signature | Date |
|---|---|---|
Goes with the JHA for crane lift, tilt-up and precast panels.
Questions crews ask
How long is the never under the load toolbox talk?
About 5 minutes: read the 4 points, ask the questions, and have the crew sign.
Which OSHA rule is it based on?
29 CFR 1926.1425.
Tomorrow, the crew signs on one phone.
Free for one site and one camera. $99 a site after. Crew is always free. 7 days of everything free, no card.
