Crane lift JHA: hazards, controls and PPE.

Start from this template, add what's different on your site today, and have the crew sign.

Make my JHA Free for one site and one camera. $99 a site after.
Free tool, no sign-up Works on a phone Crew always free
Crane lift JHAHazards · controls · talk
Hazards · Crane lift
Dropped or swinging load
Crane tipping: soft ground, overload, outriggers not out
Power line contact
Caught between the counterweight and something solid

Controls

  • Know the load weight and check it against the load chart. Critical lifts get a written plan.
  • Ground is firm, drained and level. Outriggers fully out on mats.
  • Barricade the counterweight swing radius.
  • Nobody under the load. Tag lines to control it.

All 6 hazards and 8 controls → · 29 CFR 1926 Subpart CC

Hard hatHigh-vis vestSteel-toe bootsWork glovesSafety glasses

Toolbox talk: Never under the load

A starting point, not a finished JHA. Walk the site and have the competent person sign it.

1Use the toolType the day's work. The JHA fills in.
2Add your siteFree for one site and one camera. No card.
3JHA & talks, plus what you needJHA & talks, plus crew sign-off on one phone

Hazards

  • Dropped or swinging load
  • Crane tipping: soft ground, overload, outriggers not out
  • Power line contact
  • Caught between the counterweight and something solid
  • Rigging failure
  • Wind

Controls

  • Know the load weight and check it against the load chart. Critical lifts get a written plan.
  • Ground is firm, drained and level. Outriggers fully out on mats.
  • Barricade the counterweight swing radius.
  • Nobody under the load. Tag lines to control it.
  • Certified operator, qualified signal person and qualified rigger.
  • Competent person does the shift inspection.
  • Power lines: keep 20 ft unless you know the voltage and use Table A.
  • Stop for wind over the crane maker's limit.

PPE

  • Hard hat
  • High-vis vest (Class 2; Class 3 at night)
  • Steel-toe boots
  • Work gloves
  • Safety glasses

OSHA rules

29 CFR 1926 Subpart CC · 29 CFR 1926.1402 · 29 CFR 1926.1424 · 29 CFR 1926.1425 · 29 CFR 1926.1427

Toolbox talk: Never under the load

  • Nobody under a suspended load. Ever.
  • Plan the load path away from people.
  • Use tag lines to guide it, not hands.
  • Rigging fails without warning.

The full talk, with questions for the crew →

In the Dozer app · JHA & talks

Tomorrow, the crew signs it on one phone.

Dozer writes the JHA and the toolbox talk from what you say and what the cameras saw yesterday. The crew signs on the foreman's phone, and it files itself in the site's day.

  • One JHA per task, per day, in under a minute
  • The toolbox talk that matches the work
  • Signatures on one phone, no clipboard
  • Filed with the daily log, ready for an inspector
JHA & talks in Dozer: Toolbox talk · trench safety · 12 signed LIVE Toolbox talk · trench safety · 12 signed

Photo is an AI-generated stand-in, not a customer site.

Email me the PDF

We'll send this to you as a PDF, plus a reminder if there's a date in it. One email, no list.

We use it to send this and nothing else. See privacy.

Questions crews ask

What are the hazards of crane lift?

Dropped or swinging load. Crane tipping: soft ground, overload, outriggers not out. Power line contact. Caught between the counterweight and something solid. Rigging failure. Wind.

What controls go in a crane lift JHA?

Know the load weight and check it against the load chart. Critical lifts get a written plan. Ground is firm, drained and level. Outriggers fully out on mats. Barricade the counterweight swing radius. Nobody under the load. Tag lines to control it. Certified operator, qualified signal person and qualified rigger.

What PPE is needed for crane lift?

Hard hat, High-vis vest (Class 2; Class 3 at night), Steel-toe boots, Work gloves, Safety glasses. Add what your site and the task's SDS call for.

Which OSHA rules cover crane lift?

29 CFR 1926 Subpart CC; 29 CFR 1926.1402; 29 CFR 1926.1424; 29 CFR 1926.1425; 29 CFR 1926.1427.