DOZER
JHA template

Glazing and window install JHA: hazards, controls and PPE.

Start from this template, add what's different on your site today, and have the crew sign.

Make my JHA Free for one site and one camera. $99 a site after.
Free tool, no sign-up Works on a phone Crew always free
Glazing and window install JHAHazards · controls · talk
Hazards · Glazing and window install
Cuts from glass
Dropped or broken lites
Falls from openings
Back strain

Controls

  • Inspect suction cups and vacuum lifters before each use.
  • Team lifts or glass-handling equipment.
  • Cut-resistant gloves and sleeves.
  • Guard openings and edges; tie off at 6 ft.

All 5 hazards and 6 controls → · 29 CFR 1926.501

Cut-resistant gloves and sleevesSafety glassesHard hatSteel-toe boots

Toolbox talk: Lifting without hurting your back

A starting point, not a finished JHA. Walk the site and have the competent person sign it.

1Use the toolType the day's work. The JHA fills in.
2Add your siteFree for one site and one camera. No card.
3JHA & talks, plus what you needJHA & talks, plus crew sign-off on one phone

Hazards

  • Cuts from glass
  • Dropped or broken lites
  • Falls from openings
  • Back strain
  • Wind catching a big lite

Controls

  • Inspect suction cups and vacuum lifters before each use.
  • Team lifts or glass-handling equipment.
  • Cut-resistant gloves and sleeves.
  • Guard openings and edges; tie off at 6 ft.
  • Barricade below. Stop for wind on big lites.
  • Store glass on secured A-frames.

PPE

  • Cut-resistant gloves and sleeves
  • Safety glasses
  • Hard hat
  • Steel-toe boots

OSHA rules

29 CFR 1926.501 · 29 CFR 1926.250 · 29 CFR 1926.95

Toolbox talk: Lifting without hurting your back

  • Test the weight before you lift.
  • Use the machine or a second person for heavy or awkward loads.
  • Keep it close, lift with your legs, turn with your feet.
  • Clear the path first.

The full talk, with questions for the crew →

In the Dozer app · JHA & talks

Tomorrow, the crew signs it on one phone.

Dozer writes the JHA and the toolbox talk from what you say and what the cameras saw yesterday. The crew signs on the foreman's phone, and it files itself in the site's day.

  • One JHA per task, per day, in under a minute
  • The toolbox talk that matches the work
  • Signatures on one phone, no clipboard
  • Filed with the daily log, ready for an inspector
JHA & talks in Dozer: Toolbox talk · trench safety · 12 signed LIVE Toolbox talk · trench safety · 12 signed

Photo is an AI-generated stand-in, not a customer site.

Email me the PDF

We'll send this to you as a PDF, plus a reminder if there's a date in it. One email, no list.

We use it to send this and nothing else. See privacy.

Questions crews ask

What are the hazards of glazing and window install?

Cuts from glass. Dropped or broken lites. Falls from openings. Back strain. Wind catching a big lite.

What controls go in a glazing and window install JHA?

Inspect suction cups and vacuum lifters before each use. Team lifts or glass-handling equipment. Cut-resistant gloves and sleeves. Guard openings and edges; tie off at 6 ft. Barricade below. Stop for wind on big lites.

What PPE is needed for glazing and window install?

Cut-resistant gloves and sleeves, Safety glasses, Hard hat, Steel-toe boots. Add what your site and the task's SDS call for.

Which OSHA rules cover glazing and window install?

29 CFR 1926.501; 29 CFR 1926.250; 29 CFR 1926.95.

Your site at 6 a.m., before you're there.

Free for one site and one camera. $99 a site after. Crew is always free. 7 days of everything free, no card.

Make my JHA