Lockout/tagout on equipment JHA: hazards, controls and PPE.

Start from this template, add what's different on your site today, and have the crew sign.

Make my JHA Free for one site and one camera. $99 a site after.
Free tool, no sign-up Works on a phone Crew always free
Lockout/tagout on equipment JHAHazards · controls · talk
Hazards · Lockout/tagout on equipment
Machine starting while someone works on it
Stored energy: hydraulics, springs, raised attachments
Electric shock
Pressurized lines letting go

Controls

  • Shut down, isolate, lock and tag every energy source.
  • Release stored energy: lower attachments, block raised parts, bleed hydraulic pressure.
  • Try to start it to prove it's dead.
  • Each worker puts their own lock on.

All 4 hazards and 6 controls → · 29 CFR 1926.417

Safety glassesWork glovesSteel-toe boots

Toolbox talk: Lock it out

A starting point, not a finished JHA. Walk the site and have the competent person sign it.

1Use the toolType the day's work. The JHA fills in.
2Add your siteFree for one site and one camera. No card.
3JHA & talks, plus what you needJHA & talks, plus crew sign-off on one phone

Hazards

  • Machine starting while someone works on it
  • Stored energy: hydraulics, springs, raised attachments
  • Electric shock
  • Pressurized lines letting go

Controls

  • Shut down, isolate, lock and tag every energy source.
  • Release stored energy: lower attachments, block raised parts, bleed hydraulic pressure.
  • Try to start it to prove it's dead.
  • Each worker puts their own lock on.
  • Only the person who placed the lock removes it.
  • Hand off locks properly at shift change.

PPE

  • Safety glasses
  • Work gloves
  • Steel-toe boots

OSHA rules

29 CFR 1926.417 · 29 CFR 1926.600(a)(3) · 29 CFR 1926.702(j) · 29 CFR 1910.147 (good practice)

Toolbox talk: Lock it out

  • Shut it down, lock it out, tag it.
  • Bleed off hydraulics and block anything raised.
  • Try to start it to be sure.
  • Your lock, your key. Nobody removes your lock but you.

The full talk, with questions for the crew →

In the Dozer app · JHA & talks

Tomorrow, the crew signs it on one phone.

Dozer writes the JHA and the toolbox talk from what you say and what the cameras saw yesterday. The crew signs on the foreman's phone, and it files itself in the site's day.

  • One JHA per task, per day, in under a minute
  • The toolbox talk that matches the work
  • Signatures on one phone, no clipboard
  • Filed with the daily log, ready for an inspector
JHA & talks in Dozer: Toolbox talk · trench safety · 12 signed LIVE Toolbox talk · trench safety · 12 signed

Photo is an AI-generated stand-in, not a customer site.

Email me the PDF

We'll send this to you as a PDF, plus a reminder if there's a date in it. One email, no list.

We use it to send this and nothing else. See privacy.

Questions crews ask

What are the hazards of lockout/tagout on equipment?

Machine starting while someone works on it. Stored energy: hydraulics, springs, raised attachments. Electric shock. Pressurized lines letting go.

What controls go in a lockout/tagout on equipment JHA?

Shut down, isolate, lock and tag every energy source. Release stored energy: lower attachments, block raised parts, bleed hydraulic pressure. Try to start it to prove it's dead. Each worker puts their own lock on. Only the person who placed the lock removes it.

What PPE is needed for lockout/tagout on equipment?

Safety glasses, Work gloves, Steel-toe boots. Add what your site and the task's SDS call for.

Which OSHA rules cover lockout/tagout on equipment?

29 CFR 1926.417; 29 CFR 1926.600(a)(3); 29 CFR 1926.702(j); 29 CFR 1910.147 (good practice).