DOZER
JHA template

Masonry JHA: hazards, controls and PPE.

Start from this template, add what's different on your site today, and have the crew sign.

Make my JHA Free for one site and one camera. $99 a site after.
Free tool, no sign-up Works on a phone Crew always free
Masonry JHAHazards · controls · talk
Hazards · Masonry
Wall collapse in wind before it's braced
Falls from scaffold
Silica dust cutting block and brick
Back strain

Controls

  • Limited access zone: wall height plus 4 ft, the whole length of the wall.
  • Brace walls over 8 ft until permanent support is in.
  • Masonry saw with water (Table 1).
  • Scaffold inspected each shift; fall protection over 10 ft.

All 5 hazards and 6 controls → · 29 CFR 1926.706

Hard hatSafety glassesWork glovesSteel-toe bootsRespirator when Table 1 calls for it

Toolbox talk: Masonry walls: limited access zone and bracing

A starting point, not a finished JHA. Walk the site and have the competent person sign it.

1Use the toolType the day's work. The JHA fills in.
2Add your siteFree for one site and one camera. No card.
3JHA & talks, plus what you needJHA & talks, plus crew sign-off on one phone

Hazards

  • Wall collapse in wind before it's braced
  • Falls from scaffold
  • Silica dust cutting block and brick
  • Back strain
  • Mortar burns

Controls

  • Limited access zone: wall height plus 4 ft, the whole length of the wall.
  • Brace walls over 8 ft until permanent support is in.
  • Masonry saw with water (Table 1).
  • Scaffold inspected each shift; fall protection over 10 ft.
  • Don't overload planks with block and mortar.
  • Stop for wind over the brace design limit.

PPE

  • Hard hat
  • Safety glasses
  • Work gloves
  • Steel-toe boots
  • Respirator when Table 1 calls for it

OSHA rules

29 CFR 1926.706 · 29 CFR 1926.1153 · 29 CFR 1926.451

Toolbox talk: Masonry walls: limited access zone and bracing

  • Limited access zone: wall height plus 4 ft, the full length of the wall.
  • Only the masons building it go inside the zone.
  • Brace walls over 8 ft until the permanent support is in.
  • High wind: get out of the zone.

The full talk, with questions for the crew →

In the Dozer app · JHA & talks

Tomorrow, the crew signs it on one phone.

Dozer writes the JHA and the toolbox talk from what you say and what the cameras saw yesterday. The crew signs on the foreman's phone, and it files itself in the site's day.

  • One JHA per task, per day, in under a minute
  • The toolbox talk that matches the work
  • Signatures on one phone, no clipboard
  • Filed with the daily log, ready for an inspector
JHA & talks in Dozer: Toolbox talk · trench safety · 12 signed LIVE Toolbox talk · trench safety · 12 signed

Photo is an AI-generated stand-in, not a customer site.

Email me the PDF

We'll send this to you as a PDF, plus a reminder if there's a date in it. One email, no list.

We use it to send this and nothing else. See privacy.

Questions crews ask

What are the hazards of masonry?

Wall collapse in wind before it's braced. Falls from scaffold. Silica dust cutting block and brick. Back strain. Mortar burns.

What controls go in a masonry JHA?

Limited access zone: wall height plus 4 ft, the whole length of the wall. Brace walls over 8 ft until permanent support is in. Masonry saw with water (Table 1). Scaffold inspected each shift; fall protection over 10 ft. Don't overload planks with block and mortar.

What PPE is needed for masonry?

Hard hat, Safety glasses, Work gloves, Steel-toe boots, Respirator when Table 1 calls for it. Add what your site and the task's SDS call for.

Which OSHA rules cover masonry?

29 CFR 1926.706; 29 CFR 1926.1153; 29 CFR 1926.451.

Your site at 6 a.m., before you're there.

Free for one site and one camera. $99 a site after. Crew is always free. 7 days of everything free, no card.

Make my JHA