DOZER
JHA template

Plumbing rough-in JHA: hazards, controls and PPE.

Start from this template, add what's different on your site today, and have the crew sign.

Make my JHA Free for one site and one camera. $99 a site after.
Free tool, no sign-up Works on a phone Crew always free
Plumbing rough-in JHAHazards · controls · talk
Hazards · Plumbing rough-in
Fire from soldering and brazing
Solvent cement vapors
Right-angle drill twisting wrists
Ladder falls

Controls

  • Hot work rules for torches: shield combustibles, extinguisher, fire watch.
  • Ventilate for solvent cement; read the SDS.
  • Use the drill's side handle and clutch; brace it.
  • Ladder rules apply.

All 5 hazards and 5 controls → · 29 CFR 1926.352

Safety glassesWork glovesSteel-toe bootsHard hat

Toolbox talk: Hot work fire watch

A starting point, not a finished JHA. Walk the site and have the competent person sign it.

1Use the toolType the day's work. The JHA fills in.
2Add your siteFree for one site and one camera. No card.
3JHA & talks, plus what you needJHA & talks, plus crew sign-off on one phone

Hazards

  • Fire from soldering and brazing
  • Solvent cement vapors
  • Right-angle drill twisting wrists
  • Ladder falls
  • Cave-in in sewer trenches

Controls

  • Hot work rules for torches: shield combustibles, extinguisher, fire watch.
  • Ventilate for solvent cement; read the SDS.
  • Use the drill's side handle and clutch; brace it.
  • Ladder rules apply.
  • Trench rules apply for underground work.

PPE

  • Safety glasses
  • Work gloves
  • Steel-toe boots
  • Hard hat

OSHA rules

29 CFR 1926.352 · 29 CFR 1926.59 · 29 CFR 1926.300 · 29 CFR 1926.1053

Toolbox talk: Hot work fire watch

  • Move or cover anything that can burn.
  • Extinguisher in hand reach.
  • Fire watch stays during the work and after it ends (30 to 60 minutes).
  • Check the other side of walls and the floor below for sparks.

The full talk, with questions for the crew →

In the Dozer app · JHA & talks

Tomorrow, the crew signs it on one phone.

Dozer writes the JHA and the toolbox talk from what you say and what the cameras saw yesterday. The crew signs on the foreman's phone, and it files itself in the site's day.

  • One JHA per task, per day, in under a minute
  • The toolbox talk that matches the work
  • Signatures on one phone, no clipboard
  • Filed with the daily log, ready for an inspector
JHA & talks in Dozer: Toolbox talk · trench safety · 12 signed LIVE Toolbox talk · trench safety · 12 signed

Photo is an AI-generated stand-in, not a customer site.

Email me the PDF

We'll send this to you as a PDF, plus a reminder if there's a date in it. One email, no list.

We use it to send this and nothing else. See privacy.

Questions crews ask

What are the hazards of plumbing rough-in?

Fire from soldering and brazing. Solvent cement vapors. Right-angle drill twisting wrists. Ladder falls. Cave-in in sewer trenches.

What controls go in a plumbing rough-in JHA?

Hot work rules for torches: shield combustibles, extinguisher, fire watch. Ventilate for solvent cement; read the SDS. Use the drill's side handle and clutch; brace it. Ladder rules apply. Trench rules apply for underground work.

What PPE is needed for plumbing rough-in?

Safety glasses, Work gloves, Steel-toe boots, Hard hat. Add what your site and the task's SDS call for.

Which OSHA rules cover plumbing rough-in?

29 CFR 1926.352; 29 CFR 1926.59; 29 CFR 1926.300; 29 CFR 1926.1053.

Your site at 6 a.m., before you're there.

Free for one site and one camera. $99 a site after. Crew is always free. 7 days of everything free, no card.

Make my JHA