Steel erection JHAHazards · controls · talk
Hazards · Steel erection
Falls from beams, columns and deck
Dropped steel, bolts and tools
Collapse of unbraced steel
Struck by swinging members

Controls

  • Fall protection over 15 ft. Connectors at 2 stories or 30 ft, whichever is less.
  • Controlled decking zone only for trained deckers, between 15 and 30 ft.
  • Anchor bolts and site layout approved before erection starts.
  • At least 2 bolts per connection before releasing the load line.

All 4 hazards and 6 controls → · 29 CFR 1926.760

Full-body harness and SRLHard hatNon-slip bootsWork glovesSafety glasses

Toolbox talk: Check your harness

A starting point, not a finished JHA. Walk the site and have the competent person sign it.

1Use the toolType the day's work. The JHA fills in.
2Add your siteFree for one site and one camera. No card.
3JHA & talks, plus what you needJHA & talks, plus crew sign-off on one phone

Hazards

  • Falls from beams, columns and deck
  • Dropped steel, bolts and tools
  • Collapse of unbraced steel
  • Struck by swinging members

Controls

  • Fall protection over 15 ft. Connectors at 2 stories or 30 ft, whichever is less.
  • Controlled decking zone only for trained deckers, between 15 and 30 ft.
  • Anchor bolts and site layout approved before erection starts.
  • At least 2 bolts per connection before releasing the load line.
  • Tag lines; nobody under the load.
  • Everyone trained on the steel erection fall hazards.

PPE

  • Full-body harness and SRL
  • Hard hat
  • Non-slip boots
  • Work gloves
  • Safety glasses

OSHA rules

29 CFR 1926.760 · 29 CFR 1926.752 · 29 CFR 1926.756 · 29 CFR 1926.761

Toolbox talk: Check your harness

  • Look over webbing, stitching, buckles and the D-ring before each use.
  • Check the lanyard's shock pack. Deployed means out of service.
  • Snug fit: you should get a flat hand under the leg straps.
  • D-ring between the shoulder blades.
  • Any harness that caught a fall comes out of service.

The full talk, with questions for the crew →

In the Dozer app · JHA & talks

Tomorrow, the crew signs it on one phone.

Dozer writes the JHA and the toolbox talk from what you say and what the cameras saw yesterday. The crew signs on the foreman's phone, and it files itself in the site's day.

  • One JHA per task, per day, in under a minute
  • The toolbox talk that matches the work
  • Signatures on one phone, no clipboard
  • Filed with the daily log, ready for an inspector
JHA & talks in Dozer: Toolbox talk · trench safety · 12 signed LIVE Toolbox talk · trench safety · 12 signed

Photo is an AI-generated stand-in, not a customer site.

Email me the PDF

We'll send this to you as a PDF, plus a reminder if there's a date in it. One email, no list.

We use it to send this and nothing else. See privacy.

Questions crews ask

What are the hazards of steel erection?

Falls from beams, columns and deck. Dropped steel, bolts and tools. Collapse of unbraced steel. Struck by swinging members.

What controls go in a steel erection JHA?

Fall protection over 15 ft. Connectors at 2 stories or 30 ft, whichever is less. Controlled decking zone only for trained deckers, between 15 and 30 ft. Anchor bolts and site layout approved before erection starts. At least 2 bolts per connection before releasing the load line. Tag lines; nobody under the load.

What PPE is needed for steel erection?

Full-body harness and SRL, Hard hat, Non-slip boots, Work gloves, Safety glasses. Add what your site and the task's SDS call for.

Which OSHA rules cover steel erection?

29 CFR 1926.760; 29 CFR 1926.752; 29 CFR 1926.756; 29 CFR 1926.761.