DOZER
JHA template

Temporary power and cords JHA: hazards, controls and PPE.

Start from this template, add what's different on your site today, and have the crew sign.

Make my JHA Free for one site and one camera. $99 a site after.
Free tool, no sign-up Works on a phone Crew always free
Temporary power and cords JHAHazards · controls · talk
Hazards · Temporary power and cords
Shock from damaged cords and tools
Arc flash at panels
Trips over cords
Fire from overloaded circuits

Controls

  • GFCI on all 120-volt 15, 20 and 30 amp outlets, or an assured grounding program.
  • Check cords every day. Pull frayed or damaged ones.
  • Keep cords off walkways and out of doors and pinch points.
  • Only qualified electricians work in panels.

All 4 hazards and 6 controls → · 29 CFR 1926.404(b)(1)

Safety glassesWork glovesEH-rated bootsHard hat

Toolbox talk: GFCIs and cords

A starting point, not a finished JHA. Walk the site and have the competent person sign it.

1Use the toolType the day's work. The JHA fills in.
2Add your siteFree for one site and one camera. No card.
3JHA & talks, plus what you needJHA & talks, plus crew sign-off on one phone

Hazards

  • Shock from damaged cords and tools
  • Arc flash at panels
  • Trips over cords
  • Fire from overloaded circuits

Controls

  • GFCI on all 120-volt 15, 20 and 30 amp outlets, or an assured grounding program.
  • Check cords every day. Pull frayed or damaged ones.
  • Keep cords off walkways and out of doors and pinch points.
  • Only qualified electricians work in panels.
  • Lock and tag circuits before work.
  • Covers on panels; label the disconnects.

PPE

  • Safety glasses
  • Work gloves
  • EH-rated boots
  • Hard hat

OSHA rules

29 CFR 1926.404(b)(1) · 29 CFR 1926.405 · 29 CFR 1926.416 · 29 CFR 1926.417

Toolbox talk: GFCIs and cords

  • Every 120-volt temp power outlet needs a GFCI.
  • Test the GFCI before you plug in.
  • Look over the cord: cuts, missing ground pin, taped splices mean out of service.
  • Keep cords out of water and off walkways.

The full talk, with questions for the crew →

In the Dozer app · JHA & talks

Tomorrow, the crew signs it on one phone.

Dozer writes the JHA and the toolbox talk from what you say and what the cameras saw yesterday. The crew signs on the foreman's phone, and it files itself in the site's day.

  • One JHA per task, per day, in under a minute
  • The toolbox talk that matches the work
  • Signatures on one phone, no clipboard
  • Filed with the daily log, ready for an inspector
JHA & talks in Dozer: Toolbox talk · trench safety · 12 signed LIVE Toolbox talk · trench safety · 12 signed

Photo is an AI-generated stand-in, not a customer site.

Email me the PDF

We'll send this to you as a PDF, plus a reminder if there's a date in it. One email, no list.

We use it to send this and nothing else. See privacy.

Questions crews ask

What are the hazards of temporary power and cords?

Shock from damaged cords and tools. Arc flash at panels. Trips over cords. Fire from overloaded circuits.

What controls go in a temporary power and cords JHA?

GFCI on all 120-volt 15, 20 and 30 amp outlets, or an assured grounding program. Check cords every day. Pull frayed or damaged ones. Keep cords off walkways and out of doors and pinch points. Only qualified electricians work in panels. Lock and tag circuits before work.

What PPE is needed for temporary power and cords?

Safety glasses, Work gloves, EH-rated boots, Hard hat. Add what your site and the task's SDS call for.

Which OSHA rules cover temporary power and cords?

29 CFR 1926.404(b)(1); 29 CFR 1926.405; 29 CFR 1926.416; 29 CFR 1926.417.

Your site at 6 a.m., before you're there.

Free for one site and one camera. $99 a site after. Crew is always free. 7 days of everything free, no card.

Make my JHA