Asphalt millings calculator: tons for a driveway, and how deep.
100 × 12 ft at 4 in packed takes 25.8 tons of millings, or 2 truckloads.
Length100 ftWidth12 ftDepth4 in
2 loads at 15 t
Depth is the compacted thickness. Loose millings take about 16% more room than packed ones.
- 1Sign upWith email, Google or Apple.
- 2Tell it about the siteLike you'd tell a new foreman.
- 3It opens, built for your siteCalculators, plus tons hauled from the tickets
Asphalt millings are old pavement ground off a road, sold as recycled asphalt. To figure how much: length × width in feet × compacted depth in inches ÷ 12, ÷ 27 for cubic yards, × about 1.66 tons a yard. A 100 by 12 ft driveway at 4 in takes about 26 tons with 5% extra: 2 truckloads.
The millings formula
tons = length (ft) × width (ft) × depth (in) ÷ 12 × 123 lb/ft³ ÷ 2,000
Worked example for a driveway, a parking area or a haul road: 100 ft × 12 ft at 4 in is 15.6 packed cubic yards and 25.8 tons with 5% extra, or 2 loads at 15 tons. Bought by the loose yard, that's about 18 yards.
Millings are sold by the ton, sometimes by the yard. Depth is the compacted thickness. A loose yard from the pile weighs about 1.43 tons, so a packed yard takes about 1.16 loose ones.
Millings by the square foot
| Packed depth | 100 sq ft | 1,000 sq ft | Loose yd³ |
|---|---|---|---|
| 2 in | 1.02 t | 10.3 t | 7.2 |
| 3 in | 1.54 t | 15.4 t | 10.8 |
| 4 in | 2.05 t | 20.5 t | 14.3 |
| 6 in | 3.08 t | 30.8 t | 21.5 |
No waste added. Loose yd³ is what the 1,000 sq ft takes from the pile. Millings (recycled asphalt pavement) laid as a base weigh about 123 lb/ft³ (1.66 tons per cubic yard) in place and 1.43 tons per cubic yard stockpiled: Nebraska DOT, Estimating Quantities (June 2024), bituminous foundation course, read 2026-11-15.
Loose yards and packed yards
Millings fluff up in the pile and pack down under the roller. Nebraska DOT's estimating sheet counts a stockpiled yard at 1.43 tons and a laid, compacted yard at 1.66. So it takes about 1.16 loose yards to make one packed yard, and a yard that sells by the yard is selling you loose yards.
| State | lb per ft³ | Tons per yd³ | Source |
|---|---|---|---|
| Stockpiled (loose) | 106 | 1.43 | Nebraska DOT |
| Laid and compacted, 4 in base | 123 | 1.66 | Nebraska DOT |
| Compacted, lab maximum density | 100 to 125 | 1.35 to 1.69 | FHWA |
Read 2026-11-15. Nebraska DOT, Estimating Quantities in English & Metric (June 2024), bituminous foundation course. FHWA, User Guidelines for Waste and Byproduct Materials in Pavement Construction (FHWA-RD-97-148), Reclaimed Asphalt Pavement, Table 13-2. Converted at 27 cubic feet a yard.
This calculator uses Nebraska's packed weight, so you put in the depth you want after rolling and get the tons to order.
What millings are
When a road is resurfaced, a milling machine grinds off the top inches of the old asphalt and loads it into trucks. What comes off is stone still coated with the old asphalt binder: FHWA puts the binder at 4.5 to 6% of the weight and the moisture at up to 5%. FHWA's guideline reported 80 to 85% of it being reused in recycled hot mix, cold mix or base. The rest is sold as millings, sometimes screened to take out the big chunks.
Where millings work, and where they don't
- Driveways, lots and shoulders. Nebraska DOT has a pay item just for millings on driveways and under guardrail.
- As a base course. FHWA says properly processed and blended RAP has performed as granular road base for more than 20 years. Nebraska DOT's right-of-way guidance lists bituminous millings as a foundation course, drained with subdrains.
- Haul roads and laydown yards. The same rules as a driveway, with heavier trucks: build the road base under it to the truck count, not the car count.
- Not as most of an engineered base under pavement. FHWA found bearing strength drops below normal base once RAP is more than 20 to 25% of the blend. Under new pavement, use the base the design calls for.
- Not in thin layers against plain gravel. FHWA says regular aggregate doesn't bond well with RAP and thin layers can ravel. Lay a real layer, or blend them.
How deep to lay them
Nebraska DOT figures its millings foundation course at 4 in compacted, with a quarter inch extra for trimming. That's a sound driveway layer on firm ground. On soft ground, build the support with road base first and put 3 to 4 in of millings on top. FHWA's gravel road guide asks for at least 3 in of surface gravel so there's enough to blade, and a millings surface you'll grade needs the same.
- Strip topsoil and roots, shape the subgrade with a crown, and roll it.
- Spread the millings in lifts of no more than 4 in loose, the gravel road guide's rule for compaction.
- Roll each lift. FHWA says RAP compacts better with little or no added water, so don't soak it.
- Seal it if you want less dust and loose stone. Nebraska DOT's estimate for its millings surface item includes a fog seal, an asphalt emulsion, sprayed in two coats: 0.20 gallons a square yard on the soil and 0.30 on the surface.
For new asphalt over a base instead, work out the tons on the asphalt calculator. For a clean stone top, see the gravel calculator.
Buying and hauling them
Price depends on whether a plant or a milling job near you has a pile to move, so it swings more than stone does. Ask three things: the price per ton, whether it's screened, and what delivery and the minimum cost. Put the price in the Dozer calculator and it gives you the material cost with the tons.
At 15 tons a load, the 26-ton example is 2 truckloads. Bigger trucks carry more; the dump truck capacity page has the yards and tons for each.
Running the milling job yourself? The asphalt milling JHA and the hot mix and traffic talk cover the crew, and the paving JHA the lay-down. Spreading them with a rented machine? See the skid steer rental cost.
Save it to a job. Then add up what's laid.
Save the estimate to the site.
LIVE 412 t laid · estimate 383 t AI-generated stand-in photo, not a customer site.
Questions
Something else? Ask a person.
What are asphalt millings?
Old asphalt pavement ground off a road by a milling machine before it's repaved. DOTs call it RAP, reclaimed or recycled asphalt pavement. It's crushed stone still coated with the old asphalt binder, about 4.5 to 6% of its weight on FHWA's figures.
Are asphalt millings good for a driveway?
They can be. Nebraska DOT lists millings on driveways and under guardrail as its own pay item, and FHWA says properly processed RAP has worked as road base for more than 20 years. Lay them on firm ground or a road base, compact them well, and lay a real layer: FHWA says thin layers against plain aggregate can ravel.
How many tons of asphalt millings do I need?
Length × width in feet × compacted depth in inches ÷ 12, ÷ 27 for cubic yards, × 1.66 for tons, plus 5%. A 20 by 50 ft driveway at 4 in takes about 21.5 tons; a 24 by 24 ft pad at 3 in about 9.3.
How much does a yard of asphalt millings weigh?
About 1.43 tons loose from the pile and 1.66 tons once it's packed, on Nebraska DOT's estimating sheet. Wet millings weigh more; the scale ticket wins.
How thick should asphalt millings be on a driveway?
Nebraska DOT figures its millings base course at 4 in compacted. On firm ground that's a good driveway layer. On soft ground, put road base under it first, so the millings aren't carrying the load alone.
Do you need to compact asphalt millings?
Yes. FHWA's guideline says to pay particular attention to compaction so the layer doesn't keep settling after it's built, and that RAP compacts better with little or no added water. Roll it in lifts, the same as base.