Field guides for the job site.
All 25 of Dozer's guides on one page: the machines, getting paid, the OSHA rules a foreman gets asked about, talks for the crew and the words on a site.
Machines
What each machine is, how big it gets and what it weighs, from the spec sheets.
- Dozer sizes, types and weightsCrawler, mini, LGP, wheel and electric drive dozers, real model weights and the blade types.
- Excavator sizes and weightsMinis under 10 tons to 200,000-lb machines: weights, dig depths and power by class.
- Skid steer sizes and weightsSmall, medium and large frames by rated operating capacity, with model weights.
- Heavy equipment names37 machines in 6 groups: what each one does, what else it's called, how to tell them apart.
Money, liens and pay apps
Getting paid on a job: what's held back, the notices and the deadlines, each from the statute.
- RetainageWhat's held, how it's figured on a pay app, when it's released, and the caps in four laws.
- Schedule of valuesHow to build one, with a worked earthwork SOV that adds up, retainage and stored material in.
- Notice of intent to lienThe 9 states that require one before you file, how many days ahead, and who gets it.
- Miller Act bond claimsFederal jobs: who's covered, the 90-day notice, the one-year suit deadline and the $150,000 line.
- Florida notice of commencementThe 713.13 form fields, when to record it, when it expires, and the 45-day NTO clock it starts.
OSHA rules, in plain words
The rules a foreman gets cited on, read in the CFR and put in a chart.
- OSHA trench safetyProtection at 5 ft, an engineer past 20 ft, a ladder within 25 ft, and the daily inspection.
- OSHA soil typesStable rock and Types A, B and C, the slope for each, and the field tests.
- Scaffold inspectionBefore each shift and after anything that could weaken it: every check in OSHA's scaffold rules.
- Does OSHA require a daily report?No: 25 checks each shift or day, the records OSHA does want in writing, and three states that add more.
- OSHA silica Table 1Each tool, its dust control and the respirator for under and over 4 hours a shift.
Safety with the crew
Ready to read out at the start of the shift.
- Safety stand-down kitA 30-minute agenda, the fall and trench talks, the walk, a sign-in sheet and OSHA's certificate.
- Safety moments40 one-minute topics: what to say, one question to ask, and the full talk behind each.
- Monthly safety topicsA 12-month calendar of weekly talks and safety awareness months, each date sourced.
Words on a job site
The shorthand on plans, pay apps and tickets, and the job itself.
From the blog
Longer notes on running machines and sites. All posts.
- The Best Construction Apps in 2026, ComparedProcore for a GC running the whole project. Fieldwire if you work off drawings; it has a free plan. Raken for daily reports and time cards. Contractor Foreman for office tools on a small budget, Buildertrend for home builders, CompanyCam for job photos. Dozer, which we make, is last because it does a narrower job: watching the site and drafting the daily report and JHA.
- Reading a Site Camera or a Delivery Ticket With AI Costs About a Twentieth of a CentWe ran 12 AI models over 51 job-site photos and paid the bill ourselves. The model we picked for each photo job costs under $0.0006 a read. On none of the three was the priciest model the pick.
- From Reactive to Predictive: A 90-Day Maintenance PlaybookMost fleets run on one expensive rule: fix it when it breaks. Here's a 90-day path off that rule, one machine and one fault code at a time.
- How AI Is Changing Equipment Management in Gold MiningMost gold mines still run on paper pre-trips, radio calls and end-of-shift memory. Here's what AI actually changes in that loop, and what it doesn't.
- The 5-Level Severity System That Keeps Equipment MovingNot every breakdown is equal. Here's a five-level way to sort them, so the mechanic goes where they're needed first and the small jobs still get done.
Look it up by code, task or state
Put an AI foreman on your site.
Tell it about your site. It sets up the rest.
