Concrete calculator: cubic yards for the pour.
24 × 24 ft at 4 in takes 7.5 cubic yards of concrete, or 1 truckload.
Length24 ftWidth24 ftDepth4 in
1 load at 10 yd³
Ready-mix is ordered by the cubic yard; most mixer trucks carry 8–10 yd³. An 80 lb bag makes about 0.6 ft³.
- 1Sign upWith email, Google or Apple.
- 2Tell it about the siteLike you'd tell a new foreman.
- 3It opens, built for your siteCalculators, plus tons hauled from the tickets
The concrete formula
cubic yards = length (ft) × width (ft) × depth (in) ÷ 12 ÷ 27
Worked example for a slab, footing or sidewalk: 24 ft × 24 ft at 4 in is 7.5 cubic yards and 14.6 tons with 5% extra, or 1 load.
Ready-mix is ordered by the cubic yard; round up to the next quarter yard, and expect a short-load charge on small orders at many plants. For small pours, an 80 lb bag makes about 0.6 cubic feet, so 45 bags make a yard; a 60 lb bag makes 0.45, so 60 to a yard.
Concrete by the square foot
| Depth | 100 sq ft (10 × 10) | 1,000 sq ft |
|---|---|---|
| 4 in | 1.23 yd³ | 12.4 yd³ |
| 5 in | 1.54 yd³ | 15.4 yd³ |
| 6 in | 1.85 yd³ | 18.5 yd³ |
| 8 in | 2.47 yd³ | 24.7 yd³ |
No waste added in the table. Weight used: 3,915 lb per cubic yard. Normal-weight concrete runs about 145 lb/ft³ (150 with rebar), per the Portland Cement Association.
Save it to a job. Then add up what's laid.
Save the estimate to the site.
LIVE 412 t laid · estimate 383 t AI-generated stand-in photo, not a customer site.
Questions
Something else? Ask a person.
How much concrete do I need?
Multiply length by width in feet, then by the depth in inches divided by 12. That's cubic feet. Divide by 27 for cubic yards. Add 5% for waste. 24 by 24 ft at 4 in takes about 7.5 cubic yards, or 1 truckload.
How much does a yard of concrete weigh?
About 3,915 lb, or 1.96 tons a cubic yard. Ready-mix is ordered by the cubic yard; most mixer trucks carry 8–10 yd³. An 80 lb bag makes about 0.6 ft³.
How thick should a concrete slab be?
4 in for sidewalks, patios and most garage floors, 5 to 6 in where trucks drive, and more for equipment pads, as the engineer specs. Footings and walls follow the plans.
How many yards does a concrete truck hold?
Most ready-mix trucks carry 8 to 10 cubic yards; this calculator uses 10 a load. Order a little over: running short in the middle of a pour costs more than half a yard left in the drum.